Building better technology
for the civil engineering industry

Building better technology
for the civil engineering industry

Login Login Register 

Search

Tel: +44 (0)118 945 3737

Tel: +44 (0)118 945 3737

VJTech Limited Mobile Logo Search

 Login   Tel: +44 (0)118 945 3737

 
     

First VJ Tech Open Day

Jul 19 2016
7
0
First VJ Tech Open Day

VJ Tech hosted a busy customer open day on Tuesday 12th July 2016 at their offices in Reading, Berkshire. The event was well attended by universities and commercial labs from across the country. The day started with a product overviews and demonstrations followed by discussions and a look at VJ Tech's new product development.

Adding Equipment Corrections to Clisp Studio

Adding Equipment Corrections to Clisp Studio
For some testing, system corrections may need to be applied that are not specific to a particular Instrument (e.g. Volume Change due to Cell and tube expansion in an Unsaturated Test). Alternatively, corrections may need to be applied to apparatus used in a Test that is not declared as an Instrument (e.g. frame deformation of an Oedometer). 

Adjusting PID Settings - DSC2000

Adjusting PID Settings - DSC2000

PID settings are used in Clisp Studio in conjunction with a DSC2000 to fine tune the performance of a dynamic servo, both single (DSC2000 M) and dual axis (DSC2000 MM and HM). This support document is not designed to give a full accurate account of what PID’s are and how they are calculated.


Latest Posts

Consolidation Testing - An Introduction
5/21/2019 11:38 AM | info@vjtech.net
An introduction to Direct Shear Testing
3/6/2018 9:53 AM | peter@vjtech.co.uk
Triaxial Testing - an Introduction
10/30/2017 2:03 PM | peter@vjtech.co.uk
Triaxial Cell Sand Sample Preparation
8/14/2017 9:38 AM | peter@vjtech.co.uk
Predicting long term performance of Offshore Wind Turbines using Cyclic Simple Shear
9/15/2016 4:04 PM | prash@vjtech.co.uk

Categories


Archives

2021 Apr 37 1
2021 Jan 588 1
2020 Dec 47 1
2020 Sep 3996 1
2020 Jul 1927 2
2020 Feb 65 1
2019 Nov 2692 1
2019 Oct 47 1
2019 Jul 96 1
2019 Jun 107 1
2019 May 5800 1
2018 Mar 23134 1
2017 Oct 58137 1
2017 Aug 513 1
2016 Sep 73 1
2016 Jul 7 1
2016 May 31 1
2016 Apr 72 1
2016 Feb 165 3
2016 Jan 125 1
2015 Dec 39 1
2015 Nov 148 1
2015 Mar 970 4
2015 Feb 809 1
2014 Nov 2643 8
2014 May 539 6
2014 Apr 521 7
2014 Mar 1098 10
2013 Dec 87 1

Tags

Dam
DSS
PID